Archive for August, 2017

Irety Paint

Sometimes it is a thin layer of plaster on the roof, put a patch NZ fabric and paint over when dry. The holes in the roof glued up, imposing zaplVgy that cut from the sheet, thick burlap? Radar tissue. The size of patches depends on the size of the repaired site. Then prepared from the grated iron or lead minium in natural drying oil zhidVkuyu oil paint, and it is well impregnated cut patches, keeping them in the paint for 10-15 minutes. Patches when lowering the paint must be completely dry. After removing the paint from the patch, squeeze them Here surplus imposed on previously painted, carefully smoothing his hands or stiff brush. Particularly careful Smooth edges. After 5 – I 7 days glued patches dry out, and you can start painting.

Paint should be in dry weather. If cleared to painting the roof stood two weeks or more, it obmetayut brush. When painting the roof for the first time the paint needs to be thinner than the staining for posleduyutsie times. Therefore, for the first na 1 kg of paint colors gustoterSchgoy take 0.6-0.7 kg of linseed oil. Liquid paint sticks to the roof luchSchie and penetrates all the pores. For second and subsequent staining for 1 kg of red gustotertoy take 0.4-0.5 kg of linseed oil. For staining 1m2 roof for a time required on average: ocher, 180-200 g, h umii – 70-90 g, minium iron – 35-40 g, copperhead-250-280 For the longest lifetime yavyyaetsya copperhead.

5-7 days after the first color of the roof okrShShivayut second time, then after 8-10 days Irety paint again. Maslyanaya'kraska completely dries up an average of only 10 days. Compliance with the appropriate mode of paint drying improves the quality of color. Current practice for the second time painting in 1-2 days after first does not give the highest quality. Staining technique of the roof is the same as when painting walls and ceilings.

Benefits Of Foam Insulation

How to insulate a house? The choice of materials for home insulation are concerned residents of the private sector from year to year. Heaters on the market can be divided into four groups: Quilted – glass and various mineralovata manufacturers, including mineral blocks; Leaf – extruded polystyrene, foams, etc. ; Foam – insulation that is sprayed directly on the structure and "grow" to the desired thickness. It is necessary to distinguish between the foam and liquid-based urethane foams. Other. This group includes a rather exotic or seldom-used insulation, such as mats of plant fibers, cellulose foam, kind of plaster. Experience of friends, acquaintances and neighbors shows that cotton and sheet materials have a low life, which is strongly dependent on compliance technology, "sandwich" and competencies of employees, and the imaginary ecology of these materials can cause allergies.

These problems can be eliminated by using as insulation foam insulation manufactured in Canada Aysinin (Icynene ). From other foam insulations Aysinin by the absence of any fumes, and indefinite service life. Here is a brief list of benefits Aysinin. First, the material has a lifetime warranty Aysinin from the manufacturer. Foam is not curtailed, not deformed and does not age during the entire period of operation. Moreover, applied to a wooden or metal framework Aysinin warns the processes of decay and corrosion, thus extending the life of the building.

Secondly, no additional work to prepare the surface, gluing seams, fastening of insulation and installation of hydro-and vapor-barriers. Aysinin foam has excellent adhesion to all surfaces after application forms a seamless lining, does not require any protective films. Third, Aysinin is 100% water-based, which ensures the absence in its composition of such hazardous substances as phosgene, phenol and formaldehyde. Installation of foam Aysinin is the special equipment (portable spray-water reactors). Immediately after the application of the material increases by about 100 times, filling the tiny cavities and cracks, can insulate places inaccessible to any other heaters.